RAClient relays status

Post Reply
Bogdan
Posts: 109
Joined: Sat Aug 11, 2012 9:16 pm

Re: RAClient relays status

Post by Bogdan »

Yes, thanks.
Image
Bogdan
Posts: 109
Joined: Sat Aug 11, 2012 9:16 pm

Re: RAClient relays status

Post by Bogdan »

Whenever I change the code It doesn't want to upload, the massage is com 5 already in use. So I have to use Windows task manager to stop the RAListner and RALogger, the I am able to upload the code. After that I need to use the task manager again to start the RAListner and RALogger. Is there any simpler way to get the code uploaded?
Image
Bogdan
Posts: 109
Joined: Sat Aug 11, 2012 9:16 pm

Re: RAClient relays status

Post by Bogdan »

How about relay 2 (Moon/fuge light), how can I control it (change the default setup). I can't do it via RAClient, so I need to change the code. I would like to turn on the light at 10PM and turn OFF at 10AM.
Image
Bogdan
Posts: 109
Joined: Sat Aug 11, 2012 9:16 pm

Re: RAClient relays status

Post by Bogdan »

OK I see that the moon lights turn on when the daylight turn off. YEs, I can live with that.
Image
rimai
Posts: 12881
Joined: Fri Mar 18, 2011 6:47 pm

Re: RAClient relays status

Post by rimai »

Yes, if you are using the Client, you need to start an d stop services whenever you want to communicate with the controller.
The Client needs to maintain a constant connection with your controller or it won't be able to pull data from it.
Roberto.
Post Reply