Time to get ready for the big switchover. If all goes as expected, I will be starting tomorrow afternoon.
I will be mounting the RA*, my MP40 drivers, and the RF adapter to the door of my stand (currently pretty much everything is on that door). I will be mounting the relay expansion, relay bars, dimming, salinity, water level, power strips, and a few other devices to a pegboard. I will be using a combination of zip ties, elastic cording and pegboard hooks to make it all work. I've no idea how it will turn out. I'm still up in the air how the peg board will be situated at the back of the tank, and seriously considering how I could also mount the RA* and the MP40 drivers somewhere in the back as well. I'm hoping the stand that I got to hold the ATO reservoir will be strong enough or can be modified with some minor reinforcement. All the unknowns... always the fun part
Anyway, wish me luck.




I had to fabricate that because I didnt have enough room with the mp40 drivers. Thats just a pvc plastic sheet cut to fit the profile of the gap between the wall and stand. i should have mounted it a little lower.
Everything tucked neatly behind the stand. Its a pain to get to and if I need to take any modules off it will be a pain putting it back on. But nothing like the pain I had before if I needed to get at an outlet.